Development Facilitation Program
What this Victorian Government planning pathway means for our community and how to find out more.
What is the Development Facilitation Program?
The Development Facilitation Program (DFP) is a Victorian Government planning pathway for certain projects. This page explains how the DFP works, how it differs from the usual Council planning process, and how you can find out about and comment on applications in your area.
Most planning permit applications in Yarra are assessed and decided by Council. The DFP is a different, state-run pathway for eligible projects, such as significant economic development or larger residential developments that include affordable housing. For these projects, the Minister for Planning, rather than Council, is the decision-maker. The Department of Transport and Planning manages the assessment.
What this means for you:
- You can still have your say. DFP applications are not exempt from the public notice and referral requirements of the Planning and Environment Act 1987, unless the planning scheme says otherwise.
- Ministerial permits register: view current and determined DFP applications, including applications currently on public notice, through the Ministerial permits register. Objections must be lodged via [email protected] for them to be considered in the assessment of the application.
- The Minister makes the decision, not Council. Council may be asked for its views, but the final decision rests with the Minister for Planning.
- Making a submission is important. Decisions made by the Minister under the DFP cannot be reviewed at the Victorian Civil and Administrative Tribunal (VCAT), so public notice is the main opportunity to raise your concerns.
The types of projects involved
The DFP includes several pathways and services. You may hear about these if a project is proposed near you:
- Expedited planning pathways: faster consideration of certain eligible planning permit applications and planning scheme amendments, including projects that make a significant contribution to the economy and significant residential developments that include affordable housing.
- Great Design Fast Track: a streamlined process for apartments and townhouses that demonstrate great design.
Council's role
Council does not decide DFP applications. When a DFP application is made for a site in Yarra, Council may be asked to give the Minister its views. The Minister considers these views, along with those of other agencies and the public, before making a decision.
Recent applications in Yarra
See below for Development Facilitation Program applications received for sites in Yarra from 2025 onwards. Conditions summaries are included for permit issued from July 2026. For the full details and current status of any application, visit the Ministerial permits register.
2026
- Date lodged with DTP: 26 August 2026
- Lodgement Pathway: Clause 53.22: Significant Economic Development
- Description: Development of the land for the purpose of a 13 storey, mixed-use building comprising of offices, wellness centre, a food and drink premises and a reduction in the statutory car parking requirement.
- Date lodged with DTP: 25 August 2026
- Lodgement Pathway: Clause 53.22: Significant Economic Development
- Description: Development of a self-storage facility at the subject site.
- Date lodged with DTP: 7 August 2026
- Lodgement Pathway: Clause 53.23: Significant Residential Development with Affordable Housing
- Description: Use and development of 2 mixed-use buildings containing accommodation (dwellings), office, and retail premises.
- Date lodged with DTP: 31 July 2026
- Lodgement Pathway: Clause 53.22: Significant Economic Development
- Description: Development of a 14-storey mixed-use building (plus rooftop terrace) with two basement levels. The ground floor will accommodate retail and food and beverage uses in addition to residential hotel rooms proposed on Levels 1 and 2 and 4 to 13.
- Date lodged with DTP: 10 July 2026
- Lodgement Pathway: Clause 53.22: Significant Economic Development
- Description: Construction of a fifteen (15) storey, timber structure office building with food and drink (café) tenancies and shared communal spaces associated with the office.
- Permit issued: 28 October 2026
- Date lodged with DTP: 20 May 2026
- Lodgement Pathway: Clause 53.25: Great Design Fast Track
- Description: Partial demolition in a heritage overlay and construction of an 8 storey residential apartment building containing 13 apartments and 12 car spaces.
- Permit issued: 30 September 2026
Permit conditions summary:
Issue/ Council resolution Included as conditions? Reduce overall building height to a maximum of 14.4 metres (4 storeys), reduced street wall height and increase upper level setbacks in accordance with DDO40. Not adopted
The permit allows the development substantially as submitted, retaining the 8-storey form.
Require greater façade articulation, variation in materials and design changes to reduce the appearance of a single dominant building and better respond to heritage context. Not adopted
A façade strategy is required, however no specific requirement has been included to reduce building height, massing or substantially alter the architectural expression.
Require retention of additional heritage fabric and further assessment of opportunities to reduce demolition. Not adopted
A Conservation Management Plan is required, but no condition requires retention of additional heritage fabric beyond that shown on the approved plans.
Significant revisions to the public realm interfaces to Spring Street and Argyle Street including a 1 x 1 metre corner splay at the corner of Spring Street and Argyle Street. Not adopted
The permit does not include the significant interface and public realm improvements sought by Council, including the requested corner splay and broader redesign of the street frontage treatment.
Increase bicycle parking to a minimum of 30 resident spaces and provide additional sustainable transport measures. Not adopted
A Green Travel Plan is required, however the permit does not require the increased bicycle parking sought by Council.
Vertical greenery (Council resolved condition) Not adopted Require substantial public realm improvements to Spring Street and Argyle Street interfaces, including revised entry thresholds, communal space redesign and street tree planting opportunities. Not adopted
Conditions requiring a public realm plan and associated streetscape works / street tree planting were not included.
Require revised landscape outcomes, increased soil volumes, planting details and ongoing maintenance requirements. Adopted
Detailed landscape conditions have been included.
- Date lodged with DTP: 08 April 2026
- Lodgement Pathway: Clause 53.25: Great Design Fast Track
- Description: Construction of a multi storey mixed use building comprising retail premises and 63 dwellings.
- Permit issued: 17 August 2026
Permit conditions summary:
Suggested condition Included in permit? Built form changes – reduced height (to 6 storeys), increased upper-level setbacks, 1m x 1m splay to corner. No
No changes to building envelope required
Other built form changes – townhouse setbacks, conceal lift overruns, reduce structural columns, delete window shrouds, external lighting, additional landscaping, unenclosed stairwells, relocate central stairwell, greater articulation to south elevation. In part
Window shrouds deleted
Provide external lighting
Provide planter boxes
Improve ground level layout/interface – surface treatments to distinguish public/private land, DDA compliance, service cabinet design, seating, reinstate redundant crossovers, awning heights. Yes
Conditions included
Bicycle parking – number of spaces in accordance with ESD plan; wayfinding signage; visitor and employee bicycle parking and at least 50% of resident bicycle parking to be provided at-grade;10% of spaces provided for cargo bicycles and bicycles with trailers; reposition ground level visitor spaces; include a bicycle repair station. In part
Visitor and employee bicycle parking and at least 50% of resident bicycle parking to be provided at-grade
1 cargo space
Bicycle repair station
Wayfinding signage
Charging points for EVs and bikes. No conditions included No development until the public laneway is discontinued. Yes
Condition included
Wind assessment, acoustic report, green travel plan. No conditions included
- Date lodged with DTP: 17 April 2026
- Lodgement Pathway: Clause 53.23: Significant Residential Development with Affordable Housing
- Description: Multi-storey residential development (construction of 478 dwellings across two separate buildings) with ground floor retail and two-levels of basement.
- Permit issued: 31 July 2026
Permit conditions summary:
Issue/ Council resolution Included as conditions? Non-compliance with Clause 43.02 (Design and Development Overlay – Schedule 39 – DDO39) – i.e. conditions to reduce the overall building height to 40m; reduce street wall height, increase upper level setback to Victoria Pde and Wellington St; address overshadowing of the public realm in accordance with DDO39. Not adopted Improve ground layout, including unobstructed building setback to Wellington Street, modify lobby for direct visual links, improved pedestrian pathways, expand neighbourhood garden Not adopted Submit detailed daylight modelling, using BESS assumptions/methodology and including equitable development scenario on adjoining lots to demonstrate a best practice standard can be achieved. Not adopted Redesign the Victoria Parade street wall to improve ground floor activation of the street frontage and pedestrian amenity, including relocation of loading bay. Not adopted Provide wind mitigation strategies to improve the wind comfort criteria within the Public Plaza, Neighbourhood Garden, winter garden building entry and Wellington St bicycle lanes and footpaths. Not adopted Provide additional bicycle parking and all at the ground floor with a minimum 50% at grade and to include parking for cargo bikes and bikes with trailers. Not adopted Provide a minimum 1 x 1 metre splay to the south-west corner of the building at all levels at the corner of Wellington Street and Victoria Parade and delete the arch at the entry to the Public Plaza on Wellington St. Not adopted Stairwells to be unenclosed to common areas or incorporate glazing and stairwells to be directly accessible from lobby areas. Not adopted Increase the solid to glazing ratio of the upper level. Not adopted but glare assessment required Provision of additional landscaping including vertical greenery. Not adopted No impact on Wellington Street bike lanes during construction. Not adopted
- Date lodged with DTP: 17 April 2026
- Lodgement Pathway: Clause 53.25: Great Design Fast Track
- Description: Construction of a mixed use 7 storey building containing 20 apartments, 57sqm ground floor retail tenancy (shop/café) over single basement and 18 car spaces.
- Permit issued: 27 October 2026
Permit conditions summary:
Issue/Council resolution Included as conditions? Changes to built form, including:
The overall building height reduced to a maximum of 6 storeys; reduce street wall height, increase upper level setbacks;
The floor area of the ground level commercial premises increased in size through the deletion of the ground floor of the dwelling fronting Nicholson Street and the stair entry to the communal area;
Redesign stairwells;
Vertical greening and improved articulation/detail;
Improvements to bicycle parking location, design and numbers.
Not adopted, with the exception of a condition requiring the Maisonette dwelling converted to a commercial use at ground level or modified to have an adaptable live/work space with no bedrooms at ground floor. Sustainability Management Plan
Improved ESD outcomes shown in an amended SMP.
Adopted in part
A condition for the endorsement of a sustainability management plan has been included but without the additional recommended requirements.
Street trees
Tree Management Plan
A one-off contribution of $12,000 to be used for new street tree plantings that are required as a result of the development.
Asset Protection Bond of $3,000 (ex GST) for the tree in Park Street adjacent the frontage of the development.
Adopted in full
- Date lodged with DTP: 8 April 2026
- Lodgement Pathway: Clause 53.23: Significant Residential Development with Affordable Housing
- Description: Construction of a 14 storey building containing 165 apartments (dwellings and shop), above four levels of basement.
- Permit issued: 31 July 2026
Permit conditions summary:
Suggested condition Included in permit? Built form changes to align with DDO26 – reduced height, increased upper-level setbacks, corner splay, no overshadowing of car park in Royal Place (future park) No
No changes to building envelope required
Improve ground level layout/interface In part
Conditions to include paving along laneway interface and provide a concierge desk/residential entry to south included. Condition relating to design to facilitate future pedestrian access to the lane not included.
Conservation management plan, including an assessment of whether more heritage fabric can be retained In part
CMP required, but not requiring retention of more heritage fabric
Higher degree of ‘solid to void’ to street wall Yes Bicycle parking – 1 per dwelling, 40% of employee and all visitor provided as horizontal spaces, 9 electric bike charging points No
Bicycle parking only required in accordance with the planning scheme.
Sustainability Management Plan – daylight modelling for west-facing apartments, 7 star NatHERS rating In part
Daylight modelling not required
10% affordable housing – either dwellings in the development or financial contribution No
Standard condition – 10% or dwellings or 3% financial contribution
- Date lodged with DTP: 2 April 2026
- Lodgement Pathway: Clause 53.23: Significant Residential Development with Affordable Housing
- Description: Partial demolition of buildings in a heritage overlay, Use of the land for Food and drink premises, Retail premises and Restricted retail premises and buildings and works for the construction of a four building mixed use development.
- Permit issued: 20 August 2026
- Permit conditions summary: Permit issued before Council resolved submission lodged.
- Date lodged with DTP: 31 March 2026
- Lodgement Pathway: Clause 53.23: Significant Residential Development with Affordable Housing
- Description: Redevelopment of parts of the site to deliver 151 dwellings across two apartment buildings, alongside the adaptive reuse of the original warehouse building at the south-eastern corner of the site for a cafe and resident amenities.
- Permit issued: 17 July 2026
Permit conditions summary:
Issue/ Council resolution Included as conditions? Noncompliance with Clause 43.02 (Design and Development Overlay – Schedule 22 – DDO22) – i.e. conditions to reduce the overall building height to 18m and upper level setback in accordance with DDO22. Not adopted Council resolved to increase the number of 2 bedroom apartments to 30. Not adopted Council resolved to retain the majority of the existing brick boundary wall to little Lithgow Street or allow for its like for like reconstruction. Not adopted Council resolved to provide bicycle parking at the ground floor with a minimum 50% of that at grade and to include parking for cargo bikes and bikes with trailers. Not adopted Requirement for the further retention of the former water tower and slate roofing on the main building fronting Lithgow Street for heritage reasons. Not adopted Landscape Plan - Council resolution to ensure a high survival rate of plants. Not adopted Wind – confirmation that standing wind comfort criterion is adopted to all balconies and terraces. Not adopted Council resolution to ensure no loss of on-street car parking as a consequence of integrating new street trees along Lithgow Street in a Public Realm Plan. Not adopted Construction Management Plan – Council resolution to include further conditions relating to securing adjoining properties, and management method regarding the primary school opposite. Not adopted The details of a 24hr emergency contact for surrounding residents and the primary school. Adopted - See Condition 30(n). Section 173 agreement for affordable housing requiring at least 16 dwellings to be provided as affordable and preferably in perpetuity or 25 years minimum. Not adopted – instead the standard wording at Clause 53.23-4 has been adopted. See Condition 45.
- Date lodged with DTP: 27 March 2026
- Lodgement Pathway: Clause 53.23: Significant Residential Development with Affordable Housing
- Description: Construction of an eight (8) to twelve (12) storey residential apartment building consisting of 187 apartment dwellings, and a residential townhouse development consisting of 13 dwellings and a retail tenancy to the ground floor frontage at River Street.
- Permit issued: 17 September 2026
Permit conditions summary:
Issue/ Council resolution Included as conditions? Non-compliance with Clause 43.02 (Design and Development Overlay – Schedule 1H (Yarra (Birrarung) River Corridor) – i.e. conditions to reduce the overall building height to 18m; a clear depiction of separation distances with strict adherence with the mandatory setbacks from the River Corridor. Not adopted Improved ground layout, including an increased 1.8m setback from River Street and Murphy Street to allow for integrated bicycle parking and planters. Not adopted Deletion of awnings over footpaths. Not adopted The East west pedestrian access path along Murphy Street between River Street and the stairs to the Mian Yarra Trail to have a minimum 1500mm unencumbered width. Not adopted Relocation of bicycle parking to building entrances and provide minimum 1.5m clear unobstructed pedestrian access paths around the Porte Cochere, and the vehicle entrance width of the Porte Cochere dimensioned. Not adopted Traffic Management Plan
A Traffic Management Plan to
- Review the traffic conditions and impacts of the broader area bounded by Victoria Street, Burnley Street and Bridge Road under future case scenarios; and
- Make recommendations for amendments to the proposal and/or any mitigation works to the surrounding street network to ensure that traffic generation from the development can be accommodated in the surrounding network into the future.
Not adopted
Arboricultural Impact Assessment Not adopted
Standard condition for a Tree Protection Plan included.
Wildlife management
A qualified zoologist must inspect the trees to determine if there are any fauna present, and if so, a Wildlife Management Report must be submitted.
A qualified zoologist must be present during the removal of any tree approved under this permit.
Not adopted Social and Affordable Housing Report Not adopted Section 173 Agreement – Affordable Housing
At least 10% of the total number of dwellings in the development must be provided as affordable rental housing and secured in perpetuity rather than for a fixed minimum term. If this is not achievable, the term should be a minimum of at least 25 years.
Not adopted Bicycle Parking
No less than 200 resident bicycle parking spaces must be provided on site (with at least 10 electric bicycle charging points provided in the resident bicycle parking spaces adjacent to spaces suitable for electric bicycles to use):
- No less than 50 visitor spaces must be provided on site;
- A minimum of 2 employee bicycle parking spaces must be provided; and
- At least 10 electric bicycle charging points should be provided in the resident bicycle parking spaces adjacent to spaces suitable for electric bicycles to use.
Not adopted Public Realm Improvements
A Public Realm Works plan must be submitted to and approved by the Responsible Authority for River Street, Murphy Street, Crown Street and River interface.
Mostly adopted
Excludes conditions relating to Murphy Street.
Stormwater Management Plan Not adopted but permit includes Melbourne Water’s Conditions. Cultural Heritage Management Plan (CHMP)
In the event that Aboriginal cultural heritage is discovered during the ground disturbance works, in addition to any legislative obligations, a Cultural Heritage Permit must be obtained in accordance with the statutory obligations under the Aboriginal Heritage Act 2006.
Not adopted
- Date lodged with DTP: 27 March 2026
- Lodgement Pathway: Clause 53.22: Significant Economic Development
- Description: Use and development of the land for a store (self storage facility), display of signs and alteration of access to a Transport Zone 2.
- Permit issued: 23 June 2026
- Date lodged with DTP: 26 February 2026
- Lodgement Pathway: Clause 53.22: Significant Economic Development
- Description: Expansion of the existing Richmond Club Hotel venue to the three adjoining properties at 94-100 Swan Street, with associated buildings and works at the rear of the venue to expand the four buildings into a singular venue creating a complete.
- Permit issued: 8 October 2026
- Date lodged with DTP: 21 January 2026
- Lodgement Pathway: Clause 53.23: Significant Residential Development with Affordable Housing
- Description: Construction of an 11-storey building comprising of 243 ‘Build-to-Rent’ dwellings with retail floorspace at ground level, above basement car parking, in accordance with the enclosed plans and reports.
- Permit issued: 6 May 2026
2025
- Date lodged with DTP: 20 September 2025
- Lodgement Pathway: Clause 53.23: Significant Residential Development with Affordable Housing
- Description: To demolish or remove an existing heritage building and the construction and carrying out of works for the constructions of a 12 storey residential building (including affordable housing) and ground floor retail over basement.
- Permit issued: 18 March 2026
- Date lodged with DTP: 11 September 2025
- Lodgement Pathway: Clause 53.22: Significant Economic Development
- Description: Use and development of a 13-storey residential hotel, office space, associated buildings and works and a reduction in car parking.
- Permit issued: 3 February 2026
- Date lodged with DTP: 6 September 2025
- Lodgement Pathway: Clause 53.23: Significant Residential Development with Affordable Housing
- Description: To use and develop land for an Office and for the partial demolition of a heritage building and construction of a multi-storey mixed-use apartment development, with an associated reduction in car parking at 25-37 Victoria Street, Fitzroy, and the construction of a townhouse development on part of the land at 9 Victoria Street, Fitzroy.
- Permit issued: 6 March 2026
- Date lodged with DTP: 3 September 2025
- Lodgement Pathway: Clause 53.25: Great Design Fast Track
- Description: Demolition and construction of a multi-storey residential development (seven storey development providing a total of 27 dwellings), with a reduction to the statutory car parking rate.
- Permit issued: 19 December 2025
- Date lodged with DTP: 20 June 2025
- Lodgement Pathway: Clause 53.22: Significant Economic Development
- Description: Development of the land for a 13 storey office building, use of the land for a food and drink premises, restricted recreation facility and waste to energy facility (anaerobic digester), reduction in car parking requirements and bicycle.
- Permit issued: 20 June 2026
- Date lodged with DTP: 9 April 2025
- Lodgement Pathway: Clause 53.23: Significant Residential Development with Affordable Housing
- Description: Use of the land for dwellings and place of assembly (community facility), construction of a building, removal of vegetation, reduction in car parking (for office and community facility uses) and alter access to a road in a Transport Zone 2.
- Permit issued: 6 March 2026
- Date lodged with DTP: 30 January 2025
- Lodgement Pathway: Clause 53.22: Significant Economic Development
- Description: Use and development of the land for a residential hotel (9-storey building with 89 rooms and ancillary restaurant) including a reduction of the statutory car parking requirement.
- Permit issued: 4 June 2025
Contact us
If you have questions about a development in Yarra or how the planning process works, our Statutory Planning team can help point you in the right direction. For questions about a specific DFP application, you will need to contact the Department of Transport and Planning, as the Minister for Planning is the decision-maker.
In person: Richmond Town Hall, 333 Bridge Road, Richmond (8:30am to 5pm)